How to Read a Building Contract in Queensland: What Every Client Should Check

eureka comptons

A building contract is the single most important document in any construction project. It defines what you’re getting, how much you’re paying, when it will be finished, and what happens when things go wrong. Yet most Queensland homeowners and developers sign contracts without reading them carefully or understanding the implications of every clause. This guide walks through the sections every client should review before signing.

What should the scope section include?

The scope section defines exactly what the builder will deliver. It should include the full set of architectural drawings (referenced by drawing number and revision), the specification document (materials, finishes, fixtures, fittings), any included allowances (kitchen, bathroom, flooring budgets), and the site works (excavation, retaining walls, drainage). If something isn’t in the scope section, the builder is not obligated to provide it — even if you discussed it verbally. Check this section word by word.

How should the price be structured?

For lump sum contracts, the price should be a single fixed total. For cost-plus contracts, the price structure should clearly state the margin percentage, what costs are reimbursable, and what reporting the builder will provide. For ECI contracts, there should be separate fees for the design phase and the construction phase. In all cases, the contract should clearly state what is included in the price and what is excluded (site costs, council fees, landscaping, etc.). See our pricing guide for typical inclusions and exclusions.

What is a variations clause?

Variations are changes to the original scope after the contract is signed. Every building contract should have a clear variations clause that specifies how variations are requested, how they are priced, who approves them, what happens to the completion date when variations are added, and whether the builder can charge a margin on variation costs. Poorly written variations clauses are one of the most common sources of dispute in Queensland construction. Insist on a written variation process with cost approval before work begins.

What is the practical completion clause?

Practical completion is the point at which the builder considers the work substantially finished and hands the project over to you. The contract should define what practical completion means (typically: the building is fit for its intended purpose, even if minor defects remain), what documentation the builder provides at handover, and what triggers the defect liability period. Some contracts allow the builder to claim practical completion even with a long defect list — which is not in the client’s interest. Review this clause carefully.

What is the defect liability period?

The defect liability period (DLP) is the window after practical completion during which the builder is obligated to fix defects at their own cost. In Queensland, the standard DLP for residential work is 6 years and 6 months for structural defects and 1 year for non-structural defects under the QBCC Act. Some commercial contracts specify shorter periods — check your contract against the statutory minimums. During the DLP, document all defects in writing and follow up systematically.

What are the red flags in a building contract?

Key red flags include vague or incomplete scope descriptions, allowance amounts that seem too low (kitchen, bathroom, flooring), no written variations process, payment schedules that front-load payments before work is done, no specified completion date or liquidated damages clause, termination clauses that heavily favour the builder, and dispute resolution clauses that exclude QBCC involvement. If you see any of these, get independent legal advice before signing.

Should you get legal advice on a building contract?

For any project over $500,000, independent legal review of the building contract is strongly recommended. A construction lawyer will identify unfavourable clauses, explain your rights and obligations, and may negotiate amendments before you sign. The cost of legal review ($2,000–$5,000) is small relative to the total project cost and the potential cost of a dispute.

How does Aurum Group handle contracts?

Aurum Group uses clear, industry-standard contract documentation and encourages every client to seek independent legal advice before signing. We offer three contract types — lump sum, cost-plus, and Early Contractor Involvement (ECI) — and we explain the trade-offs of each during consultation. Book a free consultation to discuss which contract structure suits your project. Read our guides on how to choose a builder and Brisbane construction costs.